Regular case · derived from the record · Games
2 merges over one day on the games surface, #1001 to #1002. Arc 99 of 136 by length.
The arc, on its own days
The surface's whole history, this arc's weeks in indigo
55 merges on games in the corpus; this arc is 2 of them.
Add GREENFIELD — the drift-gate garden game
#1001 · 2026-06-11 · feature
Agents Store: ship the game-builder operator — games.fix drains the playtest backlog
#1002 · 2026-06-11 · bugfix
What this page is
No one has written this case yet. Everything on this page is derived from the pull-request record by the same deterministic rules as the corpus: a feature or infrastructure merge opens an arc, and bug fixes, refactors, tests, and docs on the same surface within forty-five days follow it. Titles are verbatim from GitHub. Nothing here is a claim beyond the record.
A premier case that cites a merge in this arc
2 merges · 2026-02-10
2 merges · 2026-02-18
3 merges · 2026-02-22 to 2026-02-26
2 merges · 2026-03-09 to 2026-03-10
5 merges · 2026-03-17 to 2026-03-18
2 merges · 2026-06-09
2 merges · 2026-06-29 to 2026-07-01
www.jakelawrence.xyz/research/case-study-library/arc/1001
Derived at build from the corpus snapshot of 2026-09-20; re-derives on every build. Base /research/case-study-library/arc.
I design and ship AI tools, full-stack apps, and data pipelines — end to end, to production. Tell me the problem in a sentence; I'll give you an honest read on fit within a day.
Work with me →